145 - MiTo   1.4 16v TJet   LPG INJECTION CONTROL UNIT SUPPORT - R.R.   1057B83   

Detail     Detail


Enlarge the image


Removing ( Refitting )

   Op. 1057B80 GPL INJECTION SYSTEM CONTROL UNIT R R

1. Undo the LPG relay switch fixing nut.

2. Mark the position of the wiring retaining bands and remove them.


Enlarge the image


1. Undo the fixing nuts for the LPG injector control unit to the battery mounting.

2. Undo the screw (2a) and remove the LPG control unit mounting (2b).

Refitting ( Removing )

- Fit the LPG injection control unit mounting in position and tighten the fastenings to the prescribed torque.

 

Component

 

Fixing

 

dia

 

Value (daNm)

 

Validity

 

LPG control unit mounting

 

Screw

 

M6

 

0.4 ÷ 0.6

 

1.4 16V TJet 120 HP

 

Component

 

Fixing

 

dia

 

Value (daNm)

 

Validity

 

LPG control unit mounting

 

Nut

 

M6

 

0.9 ÷ 1.1

 

1.4 16V TJet 120 HP

- Fit the LPG relay switch in position and tighten the nut.

- Secure the wiring using the retaining bands.

    Op. 1057B80 GPL INJECTION SYSTEM CONTROL UNIT R R

APPLIES TO VERSIONS WITH: Euro 5

Removing ( Refitting )

   Op. 5530B10 BATTERY - R+R

   Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R

   Op. 1057B80 GPL INJECTION SYSTEM CONTROL UNIT R R

APPLIES TO VERSIONS WITH: Euro 5


Enlarge the image


1. Open the wiring retaining clips.

APPLIES TO VERSIONS WITH: Euro 5


Enlarge the image


1. Undo the fixing screws for the LPG injection control unit mounting and LPG pressure regulator mounting.

APPLIES TO VERSIONS WITH: Euro 5


Enlarge the image


1. Undo the screw (1a) and remove the LPG injection control unit mounting (1b).

APPLIES TO VERSIONS WITH: Euro 5


Enlarge the image


Refitting ( Removing )

1. Place the LPG injection control unit mounting (1a) back in its housing and tighten the screw (1b) to the prescribed torque.

APPLIES TO VERSIONS WITH: Euro 5


Enlarge the image


1. Tighten the fixing screws for the LPG injection control unit mounting and LPG pressure regulator mounting to the prescribed torque.

APPLIES TO VERSIONS WITH: Euro 5

- Close the wiring retaining clips.

APPLIES TO VERSIONS WITH: Euro 5

    Op. 1057B80 GPL INJECTION SYSTEM CONTROL UNIT R R

    Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R

    Op. 5530B10 BATTERY - R+R

APPLIES TO VERSIONS WITH: Euro 6

Removing ( Refitting )

   Op. 5530B10 BATTERY - R+R

   Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R

   Op. 1057B80 GPL INJECTION SYSTEM CONTROL UNIT R R

APPLIES TO VERSIONS WITH: Euro 6


Enlarge the image


1. Open the wiring retaining clips.

APPLIES TO VERSIONS WITH: Euro 6


Enlarge the image


1. Undo the fixing screws for the LPG injection control unit mounting and LPG pressure regulator mounting.

APPLIES TO VERSIONS WITH: Euro 6


Enlarge the image


1. Undo the screw (1a) and remove the LPG injection control unit mounting (1b).

APPLIES TO VERSIONS WITH: Euro 6


Enlarge the image


Refitting ( Removing )

1. Place the LPG injection control unit mounting (1a) back in its housing and tighten the screw (1b) to the prescribed torque.

APPLIES TO VERSIONS WITH: Euro 6


Enlarge the image


1. Tighten the fixing screws for the LPG injection control unit mounting and LPG pressure regulator mounting to the prescribed torque.

APPLIES TO VERSIONS WITH: Euro 6

- Close the wiring retaining clips.

APPLIES TO VERSIONS WITH: Euro 6

    Op. 1057B80 GPL INJECTION SYSTEM CONTROL UNIT R R

    Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R

    Op. 5530B10 BATTERY - R+R