145 - MiTo   1.4 16v TJet   BATTERY FASTENING BELT/RETAINERS - REPLACE   5530B60   

Detail     Detail

APPLIES TO VERSIONS WITH: GPL, Euro 5

Removing ( Refitting )

   Op. 5530B10 BATTERY - R+R

   Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R

APPLIES TO VERSIONS WITH: GPL, Euro 5


Enlarge the image


1. Remove the rivet (1a) using a drill. Remove the parts of the rivet.

2. Undo the nut.

3. Remove the mounting (3a) complete with battery fixing belt (3b), after raising the bracket slightly (3c).

APPLIES TO VERSIONS WITH: GPL, Euro 5


Enlarge the image


Refitting ( Removing )

- Check that the belt with mounting is not damaged.

1. Position the mounting (1a) with battery fixing belt (1b), after raising the bracket slightly (1c).

2. Screw in the nut and tighten it to the recommended torque.

 

Component

 

Fixing

 

dia

 

Value (daNm)

 

Validity

 

Battery belt

 

Nut

 

M8

 

0.7 ÷ 1.1

 

3. Fit the new rivet.

APPLIES TO VERSIONS WITH: GPL, Euro 5

    Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R

    Op. 5530B10 BATTERY - R+R

APPLIES TO VERSIONS WITH: GPL, Euro 6

Removing ( Refitting )

   Op. 5530B10 BATTERY - R+R

   Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R

APPLIES TO VERSIONS WITH: GPL, Euro 6


Enlarge the image


1. Release the wiring retainers (1a) from the mounting (1b), using the appropriate tool.

 

Tool

 

Name

 

Function

 

Validity

 

1823015000

 

Knife

 

Retainer removal

 

2. Remove the rivet (2a) using a drill. Keep the parts of the rivet.

3. Undo the nut.

4. Remove the mounting (1b) complete with battery fixing belt (4a), after raising the bracket slightly (4b).

APPLIES TO VERSIONS WITH: GPL, Euro 6

Refitting ( Removing )

- Check that the belt and mounting are not damaged.

APPLIES TO VERSIONS WITH: GPL, Euro 6


Enlarge the image


1. Position the mounting (1a) complete with battery fixing belt (1b), after raising the bracket (1c) slightly.

2. Screw in the nut and tighten it to the prescribed torque.

 

Component

 

Fixing

 

dia

 

Value (daNm)

 

Validity

 

Battery belt

 

Nut

 

M8

 

0.7 ÷ 1.1

 

3. Fit the new rivet.

4. Engage the retainers (4a) of the wirings to the mounting (1a).

APPLIES TO VERSIONS WITH: GPL, Euro 6

    Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R

    Op. 5530B10 BATTERY - R+R