145 - MiTo   1.4 16v TJet   THERMOSTAT- R + R   1088C40   

Detail     Detail

Removing ( Refitting )

- Position the vehicle on a lift.

   Op. 5530B10 BATTERY - R+R

   Op. 7055B54 PROTECTION/GUARD UNDER ENGINE -R.R.

   Op. 0010T20 ENGINE COOLANT - CHANGE


Enlarge the image


1. Undo the connector for the coolant supply pipe to the engine oil heat exchanger, thermostat side.

2. Loosen the band and disconnect the radiator coolant supply pipe, thermostat side.

3. Disconnect the degassing pipe rapid connector.


Enlarge the image


1. Detach the electrical connection for the engine coolant temperature sensor.

 

 

Description

 

Connector

 

1

 

Engine coolant temperature sensor/sender unit

 

   See K036 ENGINE COOLANT TEMPERATURE SENSOR/SENDER UNIT

2. Loosen the band and disconnect the heater supply pipe.


Enlarge the image


1. Undo the bolts (1a) and remove the thermostat (1b).


Enlarge the image


1. Remove the O-ring from the thermostat.

2. If necessary, undo the coolant temperature sensor and remove it.

Refitting ( Removing )

- Fit a new O-Ring in the groove on the thermostat.


Enlarge the image


1. Fit the thermostat (1a) in place and tighten the bolts (1b) to the recommended torque.

 

Component

 

Fastening

 

Ø

 

Value (daNm)

 

Validity

 

Thermostat

 

Screw

 

M6

 

0.9 ÷ 1.1

 

1.4 16v TJet

1.4 Turbo MultiAir

- Connect the supply pipe to the heater and tighten the band.

- Connect the electrical connection for the engine coolant temperature sensor.


Enlarge the image


1. Tighten the connector for the engine oil heat exchanger coolant supply pipe complete with new gaskets and tighten to the recommended torque.

 

Component

 

Fastening

 

Ø

 

Value (daNm)

 

Validity

 

Coolant supply pipe to engine oil heat exchanger

 

Connector

 

M16

 

3.0 ÷ 3.6

 

1.4 16v TJet

1.4 Turbo MultiAir

The connector should be tightened keeping the pipe still. Any movements of more than 3° affect the seal of the connector.

2. Connect the coolant supply pipe to the radiator and tighten the band.

3. Connect the degassing pipe rapid connector.

    Op. 5530B10 BATTERY - R+R

    Op. 0010T20 ENGINE COOLANT - CHANGE

    Op. 7055B54 PROTECTION/GUARD UNDER ENGINE -R.R.

- Remove the vehicle from the lift.

    Op. 7055B54 PROTECTION/GUARD UNDER ENGINE -R.R.

    Op. 0010T20 ENGINE COOLANT - CHANGE