145 - MiTo   1.4 16v TJet   Cylinder 4 injector   P0204   


NO SIGNAL

 

 

 

Test results

 

1

 

ELECTRICAL CONNECTIONS CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check for loose electrical connections at the injector connector, at the engine management control unit and at the isolating connector.

 

Go to Step 2

 

Presence of loose electrical connections.

 

Restore the correct connections.

 

2

 

WIRING CONTINUITY CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check for breaks in the wiring continuity

 See E5030 PETROL ENGINES ELECTRONIC MANAGEMENT

 

Go to Step 3

 

Breaks in the wiring continuity.

 

Restore the correct continuity for the wiring.

 

3

 

WIRING INSULATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check the condition of the wiring insulation (short circuit to GND).

 

Go to Step 4

 

Wiring insulation faulty.

 

Restore correct wiring insulation.

 

4

 

INJECTOR OPERATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check that the injector is working properly by carrying out the

 See Test 1056BA INJECTOR OPERATION CHECK

 

Go to Step 5

 

Injector not working/stuck.

 

Replace the injector

 Op. 1056B68 SET OF INJECTORS - R + R WITH FUEL MANIFOLD PIPE REMOVED - INCLUDES SEAL REPLACEMENT

 

5

 

ENGINE MANAGEMENT CONTROL UNIT OPERATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check that the engine management control unit is working properly.

 

End of diagnosis

 

Engine management control unit faulty.

 

Replace the engine management control unit

 Op. 1056B82 INJECTION/IGNITION SYSTEM E.C.U. (ONE) - R + R

ABOVE THRESHOLD

 

 

 

Test results

 

1

 

ELECTRICAL CONNECTIONS CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check for loose electrical connections at the injector connector, at the engine management control unit and at the isolating connector.

 

Go to Step 2

 

Presence of loose electrical connections.

 

Restore the correct connections.

 

2

 

WIRING CONTINUITY CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check for breaks in the wiring continuity

 See E5030 PETROL ENGINES ELECTRONIC MANAGEMENT

 

Go to Step 3

 

Breaks in the wiring continuity.

 

Restore the correct continuity for the wiring.

 

3

 

WIRING INSULATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check the condition of the wiring insulation (short circuit to Vbatt).

 

Go to Step 4

 

Wiring insulation faulty.

 

Restore correct wiring insulation.

 

4

 

INJECTOR OPERATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check that the injector is working properly by carrying out the

 See Test 1056BA INJECTOR OPERATION CHECK

 

Go to Step 5

 

Injector not working/stuck.

 

Replace the injector

 Op. 1056B68 SET OF INJECTORS - R + R WITH FUEL MANIFOLD PIPE REMOVED - INCLUDES SEAL REPLACEMENT

 

5

 

ENGINE MANAGEMENT CONTROL UNIT OPERATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check that the engine management control unit is working properly.

 

End of diagnosis

 

Engine management control unit faulty.

 

Replace the engine management control unit

 Op. 1056B82 INJECTION/IGNITION SYSTEM E.C.U. (ONE) - R + R

BELOW THRESHOLD

 

 

 

Test results

 

1

 

ELECTRICAL CONNECTIONS CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check for loose electrical connections at the injector connector, at the engine management control unit and at the isolating connector.

 

Go to Step 2

 

Presence of loose electrical connections.

 

Restore the correct connections.

 

2

 

WIRING CONTINUITY CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check for breaks in the wiring continuity

 See E5030 PETROL ENGINES ELECTRONIC MANAGEMENT

 

Go to Step 3

 

Breaks in the wiring continuity.

 

Restore the correct continuity for the wiring.

 

3

 

WIRING INSULATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check the condition of the wiring insulation (short circuit to GND).

 

Go to Step 4

 

Wiring insulation faulty.

 

Restore correct wiring insulation.

 

4

 

INJECTOR OPERATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check that the injector is working properly by carrying out the

 See Test 1056BA INJECTOR OPERATION CHECK

 

Go to Step 5

 

Injector not working/stuck.

 

Replace the injector

 Op. 1056B68 SET OF INJECTORS - R + R WITH FUEL MANIFOLD PIPE REMOVED - INCLUDES SEAL REPLACEMENT

 

5

 

ENGINE MANAGEMENT CONTROL UNIT OPERATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check that the engine management control unit is working properly.

 

End of diagnosis

 

Engine management control unit faulty.

 

Replace the engine management control unit

 Op. 1056B82 INJECTION/IGNITION SYSTEM E.C.U. (ONE) - R + R