145 - MiTo   1.4 16v TJet   "Turbocharger/Supercharger Boost Sensor ""B"" Circuit Range/Performance"   P0240   


BELOW LOWER LIMIT

 

 

 

Test results

 

1

 

CHECK ON CONNECTIONS AT TURBOCHARGING SENSOR AND AT ENGINE MANAGEMENT CONTROL UNIT

 

All OK

 

Problems encountered

 

Operation

 

 

Check for the presence of loose connections at the turbocharging sensor and at the engine management control unit

 

Go to Step 2

 

Presence of loose connections

 

Restore the correct connections.

 

2

 

CHECK ON WIRING INSULATION AND INTERRUPTION

 

All OK

 

Problems encountered

 

Operation

 

 

Check that the wiring is correctly insulated and check for breaks.

 

Go to Step 3

 

1. Wiring insulation not correct

2. Breaks in the wiring.

 

1. Restore correct insulation

2. Restore the correct wiring.

 

3

 

TURBOCHARGING AIR BY-PASS SOLENOID OPERATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check that the turbocharging air by-pass solenoid is working properly

 See Test 1064BH CHECK ON OPERATION OF SUPERCHARGING AIR BY-PASS SOLENOID VALVE (SHUT OFF)

 

Go to Step 4

 

Solenoid not working properly.

 

Replace the by-pass solenoid

 Op. 1048B58 TURBOCHARGER AIR BY-PASS VALVE - R.R.

 

4

 

AIR SEEPAGE CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check for the presence of air seepage in the pipe connecting the turbocharger to the throttle body.

 

End of diagnosis

 

Presence of air seepage

 

Restore the correct pipe seal.

ABOVE LOWER LIMIT

 

 

 

Test results

 

1

 

CHECK ON CONNECTIONS AT TURBOCHARGING SENSOR AND AT ENGINE MANAGEMENT CONTROL UNIT

 

All OK

 

Problems encountered

 

Operation

 

 

Check for the presence of loose connections at the turbocharging sensor and at the engine management control unit

 

Go to Step 2

 

Presence of loose connections

 

Restore the correct connections.

 

2

 

CHECK ON WIRING INSULATION AND INTERRUPTION

 

All OK

 

Problems encountered

 

Operation

 

 

Check that the wiring is correctly insulated and check for breaks.

 

Go to Step 3

 

1. Wiring insulation not correct

2. Breaks in the wiring.

 

1. Restore correct insulation

2. Restore the correct wiring.

 

3

 

TURBOCHARGING AIR BY-PASS SOLENOID OPERATION CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check that the turbocharging air by-pass solenoid is working properly

 See Test 1064BH CHECK ON OPERATION OF SUPERCHARGING AIR BY-PASS SOLENOID VALVE (SHUT OFF)

 

Go to Step 4

 

Solenoid not working properly.

 

Replace the by-pass solenoid

 Op. 1048B58 TURBOCHARGER AIR BY-PASS VALVE - R.R.

 

4

 

AIR SEEPAGE CHECK

 

All OK

 

Problems encountered

 

Operation

 

 

Check for the presence of air seepage in the pipe connecting the turbocharger to the throttle body.

 

End of diagnosis

 

Presence of air seepage

 

Restore the correct pipe seal.